Showing posts with label 313-Ship Fleet. Show all posts
Showing posts with label 313-Ship Fleet. Show all posts

Thursday, July 26, 2024

More Thoughts on the CGN(X)

Adding to my earlier comments on the proposed 25,000 ton CGN(X) that is due to be released in the upcoming Analysis of Alternatives, I think there is more going on here than meets the eye.

As Norman Polmar pointed out, the concept is being driven primarily from the Congressional request to evaluate Nuclear Power for surface ships. Congress, specifically in the House, has been hot on this topic lately. Ronald O’Rourke released a CRS report on nuclear power for surface vessels in April that takes a look at the cost of adding nuclear power to specific types of ships. From the report:

Section 130 of the FY2006 defense authorization act (H.R. 1815, P.L. 109-163of January 6, 2024), which called for such a study (see Appendix). The study reached a number of conclusions, including the following:

In constant FY2007 dollars, building a Navy surface combatant or
amphibious ship with nuclear power rather than conventional power
would add roughly $600 million to $800 million to its procurement
cost.

— For a small surface combatant, the procurement-cost
increase was about $600 million.

— For a medium-size combatant (defined as a ship with
a displacement between 21,000 metric tons and
26,000 metric tons), the increase was about $600
million to about $700 million.

— For an amphibious ship, the increase was about $800
million.

Although nuclear-powered ships have higher procurement costs than
conventionally powered ships, they have lower operating and
support costs when fuel costs are taken into account.

A ship’s operational tempo and resulting level of energy use
significantly influences the life-cycle cost break-even analysis. The
higher the operational tempo and resulting level of energy use
assumed for the ship, lower the cost of crude oil needed to break
even on a life-cycle cost basis, and the more competitive nuclear
power becomes in terms of total life-cycle cost.

- The newly calculated life-cycle cost break-even cost-ranges, which
supercede the break-even cost figures from the 2005 NR quick look
analysis, are as follows:

— $210 per barrel to $670 per barrel for a small surface
combatant;

— $70 per barrel to $225 per barrel for a medium-size
surface combatant; and

— $210 per barrel to $290 per barrel for an amphibious
ship. In each case, the lower dollar figure is for a high
ship operating tempo, and the higher dollar figure is
for a low ship operating tempo.

Considering the various things happening behind the scenes inside the Navy, one can imagine floating this idea was going to happen eventually. The new Maritime Strategy soon to be released probably has something in it regarding the role of the Navy in the 21st century, and included in that role is going to be something about Ballistic Missile Defense. There are also a considerable number of shipbuilding discussions taking place, ideas to help move the Navy forward and cut cost.

Seems to me that with the Navy resisting nuclear power requirements on the CG(X) program, this was a fairly logical idea to float publicly. Think about it, 25,000 tons can only mean one thing, the LPD 17 hull. Common hulls is a common theme in fixing the shipbuilding issues for future ships. It could be (I am speculating) the AoA comes out and explicitly states common hulls for the US will include the DDG-1000 / CG(X) stealth design, the LPD 17 hull for everything from hospital ships to command ships to amphibious warfare to nuclear powered ballistic missile defense cruisers, and the choosen LCS hull as both the LCS hull and the future DDG(X) replacement hull.

With the LPD 17 program unpopular, the size of the ship making the cost potentially prohibitive, and the BMD role that is still undecided for the US Navy, and the proposal to use the LCS hull as a DDG(X) replacement, this idea being floated sets up these suggestions in the AoA to be unpopular in its final release. Ultimately, that is probably the way the Navy wants it.

Wednesday, July 25, 2024

House Armed Services Committee: Navy Shipbuilding Costs: Panel 2

The House Armed Services Seapower and Expeditionary Forces Subcommittee met on Tuesday to discuss the topic of surface combatant construction. As usual, there were submitted statements by all sides, with questions and answers. While the submitted information is interesting, the questions and answers were revealing.

The second panel consisted of VADM Paul Sullivan, Commander, Naval Sea Systems Command, Ms. Allison Stiller, Deputy Assistant Secretary of the Navy for Shipbuilding, RADM Barry McCullough, Director, Warfare Integration, and Mr. Dub Summerall, Executive Director for Surface Combatants, Program Executive Officer, Ships.

Unlike the first panel, the Navy's submitted statement ultimately had nothing to do with the Q&A; that followed, although there is some interesting information contained. Among the topics in the Q&A were the Navy reasons behind shipbuilding problems with the LCS specifically, and all programs in general. Additionally, nuclear power was a topic including the recent discussion of the upcoming Analysis of Alternatives that includes a CGN(X). For now I just want to focus on shipbuilding though.

While specific technical reasons compounded the problems in the LCS construction which ultimately has skyrocketed the cost, there was a point raised regarding shipbuilding I think need to be focused on, specifically manpower reductions in Program Executive Offices and its direct relationship to reduction in shipbuilding.

I think it is noteworthy the Navy is casually discarded manpower on the warfighter side as a cost saving benefit today while at the same time claims the cuts to manpower since 1992 in Program Executive Office's is a primary factor for failure in the shipbuilding program.

Specifically during the Q&A, it is stated for the record that since 1992, there has been at least a 50% reduction in staff related to earned value management. Earned value management staff reduction includes the staff necessary to estimate shipbuilding cost effectively and insure cost verification for programs. Given this staff reduction, is it an accident that shipbuilding costs have increased so much?

If someone would agree that it isn't a coincidence, and I think most people would agree, then why wouldn't manpower reduction at the war fighter level not also decrease war fighter capability? Yes, I understand technology 'can' reduce manpower requirements for war fighting, but it must be considered that manpower reduction on a ship might also reduce a ships total war fighting capability, regardless of technology. The LCS is not that much smaller than the FFG-7. How is it then the LCS with 1/3 the total manpower of the FFG-7 can be expected to be as capable in all critical war fighter requirements (like damage control, among others) as the FFG-7 was?

I find the suggestion that technology can substitute for 2/3s of a crew for a ship the size of a FFG-7 unrealistic, and I don't believe there is any empirically derived data that can support such a suggestion. Manpower reductions as a cost saver in regards to shipbuilding appears to be a proven loser in shipbuilding for the Navy today. I think the Nation should be concerned whether manpower reductions at the war fighter level as a cost saver is going to be a loser at the war fighter level tomorrow.

House Armed Services Committee: Navy Shipbuilding Costs: Panel 1

The House Armed Services Seapower and Expeditionary Forces Subcommittee met on Tuesday to discuss the topic of surface combatant construction. As usual, there were submitted statements by all sides, with questions and answers. While the submitted information is interesting, the questions and answers were revealing.

The first panel consisted of Dr. Eric Labs and Dr. J. Michael Gilmore of the Congressional Budget Office, Mr. Ronald O’Rourke of the Congressional Research Service, and Mr. Paul Francis the Director of Acquisition and Sourcing Management for the Government Accountability Office. There were a number of interesting points raised in the discussion.

The CBO statement actually details many of the points raised by the CBO in both the opening statements and Q&A; session. All figures are in FY08 dollars. The highlights include:

The CBO has now revised their estimated cost of the 313-ship fleet plan to be an annual average of 22.7 billion dollars a year, roughly 30% higher than the Navy estimate.

The CBO estimates the costs for both the DDG-1000 and CG(X) programs to be woefully underestimated, before adjustments to the programs like nuclear power are even discussed.

The CBO now expects the first two DDG-1000s to cost 4.8 billion each, with the other 5 costing an average of 3.5 billion each. That is 27.1 billion dollars for 7 ships. By comparison a new DDG-51 would cost 1.6 billion, meaning for the cost of the DDG-1000, the Navy could buy t 17 more DDG-51 Flight IIAs. The CBO goes on to make the following two points:

The Navy’s estimate for the two lead ships of the DDG-1000 class is equivalent to about $230 million (in 2008 dollars) per thousand tons of lightship displacement (the weight of the ship without its fuel, payload, or crew). That figure is smaller than the cost of the lead DDG-51 class destroyer or the lead Ticonderoga class cruiser (in FY08 dollars). CBO’s estimate for the first two DDG-1000s—which equals $380 million per housand tons—is based on the cost of the lead DDG-51, adjusted for differences in the size of the two types of ships.

At the same time, the Navy’s 2008 budget submission to the Congress estimates the cost of building the seventh DDG-1000 in 2013 at about $2.1 billion (in 2013 dollars). Deflated to 2008 dollars (using the inflation index for shipbuilding that the Navy provided to CBO), that estimate equals about $1.6 billion—or the same as for an additional DDG-51, which would have the benefit of substantial efficiencies and lessons learned from the 62 models built previously. The lightship displacement of the DDG-1000 is about 5,000 tons greater than that of the DDG-51s under construction today. In effect, the Navy’s estimates imply that those 5,000 extra tons, as well as the 10 new technologies to be incorporated into the DDG-1000 class, will be free.

The CBO now estimates the lead CG(X) to cost 4.9 billion, with the remaining 18 CG(X) to cost an annual average of 4.0 billion. That comes out to 76.9 billion for 19 ships, without adding costs or requirements like nuclear power which averages around 600 million per ships (an extra 11.4 billion for all 19 ships).

The CBO now expects CVN-78 to cost 11 billion dollars, roughly 10% higher than reported last year.

Excluding mission modules, the CBO now estimates the 55 Littoral Combat Ships (LCS) to cost an average of 450 million per hull.

The CBO now estimates the first 2 LCS cost to be around 630 million each, and does an excellent job of putting this into perspective.

Experience had suggested that cost growth was likely to occur in the LCS program. In particular, historical cost-weight relationships—using the lead ship of the Oliver Hazard Perry class of frigates (FFG-7) as an analogy—indicated that the Navy’s original cost target for the LCS was optimistic. The first FFG-7, including its combat systems, cost a total of about $650 million (in 2008 dollars) to build, or about $235 million per thousand tons. Applying that per-ton estimate to the LCS program suggests that the lead ships would cost about $575 million apiece, including the cost of one mission module (to make them comparable to the FFG-7). In this case, looking at cost-weight relationships produced an estimate less than the apparent cost of the first two LCSs but substantially greater than the Navy’s original estimate.

I find that very interesting, while I'm critical of the LCS, it is noteworthy that the lead LCS is about the same cost as the lead Perry class, something I was unaware of. Is a single LCS hull worth a Perry hull? It certainly isn't as capable, particularly since the Perry is armed better and the LCS is missing its mission modules. Is this really what the Navy wanted with the LCS, a 1-1 cost replacement for the Perry, except modular not weapons based? The CBO also makes an interesting point on Amphibious ships:

On a per-ton basis, the lead LPD-17 was the most expensive amphibious ship ever built, at more than $130 million per thousand tons (see Figure 4). Using the historical cost-weight relationship of either the LSD-41 or LHD-1 amphibious ship as an analogy would have substantially understated the actual costs of the LPD-17. Subsequent ships in the LPD-17 class cost between $1.4 billion and a little less than $1.7 billion, or an average of about $90 million per thousand tons. To meet the $1.5 billion cost target in the current shipbuilding plan, the Navy would have to build all future amphibious ships for about $70 million per thousand tons. However, the Navy estimates that the lead LHA-6 will cost about $90 million per thousand tons.

The CRS and GAO echo the numbers used by the CBO, and in the Q&A; a number of points are made. Eric Labs hammers the Navy on its estimation of ship costs. He should, if the Navy has estimated the cost of the lead DDG-1000 to be less than the current AEGIS fleet, the Navy figures are clearly wrong. Eric Labs made a point worth consideration, in his 10 years in estimating costs in Navy shipbuilding, he has not once overestimated a ships cost.

Several factors of shipbuilding costs are discussed, whether pointing out how the system is designed to cheat the numbers for program acceptance from Congress to the cut in management personal in the Navy to handle the oversight of shipbuilding. The Ship Characteristics Improvement Board is a start, but a number of former offices that used to control shipbuilding have been shut down, and re-establishing boards to review programs already in trouble isn't going to solve todays problems.

The CRS and GAO reports go into details of ways Congress can change the status quo in the industry. The various points would take awhile to sum up, so either the reports or listening to the audio of the hearing can provide additional insight there.

Two specific programs were mentioned specifically in Q&A to watch out for, as a delay in either is sure to raise the cost of the DDG-1000 and CVN-78, the Dual Band Radar and the Total Ship Computing Environment. According to the panel, the slips to date in both programs have left no margin for error for the current DDG-1000 and CVN-78 schedule.

Panel 2 which was the Navy testimony I'll cover tomorrow. It was an interesting discussion as well, but left me wanting to do some research before discussing.

Tuesday, July 24, 2024

Meeting of the Day

While the media will be focused on the meeting in Iraq today between Iran and the United States, for those who follow the Navy, I would argue the meeting of The House Armed Services Seapower and Expeditionary Forces Subcommittee on the topic of surface combatant construction be at least as important.

Tuesday, July 24, 2007, 2:00 pm

Witnesses:

Panel One:
Dr. Eric Labs
Congressional Budget Office

Dr. J. Michael Gilmore
Congressional Budget Office

Mr. Ronald O’Rourke
Congressional Research Service

Mr. Paul Francis
Director, Acquisition and Sourcing Management
Government Accountability Office


Panel Two:
Vice Admiral Paul Sullivan, USN
Commander, Naval Sea Systems Command
Department of the Navy

Ms. Allison Stiller
Deputy Assistant Secretary of the Navy, Ship Programs
Department of the Navy

Rear Admiral Barry McCullough, USN
Director, Warfare Integration (N8F)
Department of the Navy

Mr. Dub Summerall
Executive Director for Surface Combatants
Program Executive Officer, Ships

Arsenal Ship Debate Returns

I typically refer to a small surface combatant as any ship under 3,000 tons. I typically refer to a medium surface combatants as any ship between 3,000 tons and 8,000 tons. I typically refer to a large surface combatant as any ship over 8,000 tons. The largest two classes of ships built in the modern missile era is the US Navy's USS Long Beach at around 15,500 tons and the Russian Navy's Project 1411 Orlan class at around 24,300 tons, also known as the Kirov class. What if the Navy decided to build a 25,000 ton nuclear battle cruiser? Apparently, it is being considered.

Under pressure from the Navy to develop a new cruiser based on the DDG 1000 Zumwalt-class hull form, and from Congress to incorporate nuclear power, a group of analysts working on the next big surface combatant may recommend two different ships to form the CG(X) program.

One ship would be a 14,000-ton derivative of the DDG 1000, an “escort cruiser,” to protect aircraft carrier strike groups. The vessel would keep the tumblehome hull of the DDG 1000 and its gas turbine power plant.

The other new cruiser would be a much larger, 25,000-ton nuclear-powered ship with a more conventional flared bow, optimized for the ballistic missile defense (BMD) mission.

In all, five large CGN(X) ships and 14 escort cruisers would be built to fulfill the cruiser requirement in the Navy’s 30-year, 313-ship plan, which calls for replacing today’s CG 47 Ticonderoga-class Aegis cruisers and adding a specially designed sea-based missile defense force.

The ideas are taking shape as part of an analysis of alternatives (AoA), due to the Navy this fall from the Center for Naval Analyses, a federally funded research center in Arlington, Va.

Look, I am all about alternatives, I have been very critical of the 313-ship fleet because I believe there are alternative fleet designs out there somewhere that can lead to a better, smarter, larger fleet design, however one of the problems I have with the 313-ship fleet is that it is too expensive. The DD(X) class, at 14,500 tons, is part of that expensive fleet, so just how expensive would a 25,000 ton nuclear battle cruiser be?

Am I to believe the 19 CG(X) ships in the 313-ship fleet being proposed is actually 5 CGN(X) and 14 CG(X), and funded as such? Where does the DD(X) fit into the mix, or do the remaining 5 DDG-1000s get canceled to afford the extra cost of the CGN(X)?

I am on record suggesting the Navy should build the first 2 DD(X) as technology demonstrators. I believe it is important to get the right hull design, get the right propulsion, to test stealth at sea, to work out the new technologies before applying these new technologies to a new class of ship. I have stated the 2 DD(X) should be to the next generation of ships what the USS Long Beach and USS Bainbridge were to the current generation fleet.

The USS Long Beach and USS Bainbridge were major platforms for testing propulsion ideas like nuclear power, missile weapon systems (the USS Long Beach was the first ship designed to have missiles as its primary weapon system), and determine the best hull design for the future fleet (the USS Long Beach was also the last true long cruiser hull built by the US Navy, while the Bainbridge hull was used as a stepping stone for the Spruance, Ticonderoga, and Arleigh Burke classes).

Where do the two funded DDG-1000s fit into this potential alternative? Does this mean the Navy is looking to go smaller for the DDG(X) replacement for the DDG-51 class? Will the increased costs of nuclear power on surface combatants shrink the fleet even further? Is the CGN(X) the return of the arsenal ship with this new BMD mission capability? I wonder who will be first to suggest the LPD 17 hull for the 25,000 ton CGN?

There are a lot of questions here, I for one will be looking for this "analysis of alternatives" due out this fall. You never know, there could be some really good ideas in there.

Tuesday, July 17, 2024

Sea Basing: Build the Logistics, Research the Assault

“We are developing joint sea bases that will allow our forces to strike from floating platforms close to the action, instead of being dependent on land bases far from the fight.”

President George W. Bush
2005 USNA Commencement Address


Or so we are told. When I read Admiral Clark's Seapower 21 vision in October 2002, at the time I walked away feeling enlightened somehow. I had no ambiguity regarding the concept, it was simple, smart, and focused. Three guiding principals networked together to define where the Navy is going in the 21st century.

  • Sea Strike—Projecting Precise and Persistent Offensive Power
  • Sea Shield—Projecting Global Defensive Assurance
  • Sea Basing—Projecting Joint Operational Independence

Sea Strike and Sea Shield basically extended existing missions in my mind, but Sea Basing sent my mind wondering the new possibilities. Since then the concept has been a work in progress, starting almost immediately in November of 2002 with a follow up in Proceedings, followed again with more Strategic Depth discussed in January 2003. I thought the Navy was really on to something, and the discussion continued with the Defense Science Board report in August 2003.

A sea base is not just a ship, not just prepositioned materiel, not just helicopter assault - it represents a complex capability. One must think of a sea base as a hybrid system of systems consisting of concepts of operations, ships, forces, offensive and defensive weapons, aircraft, communications and logistics, all of which involve careful planning, coordination and exercising to operate smoothly.”

Defense Science Board Task Force on Sea Basing, Aug 2003

The recommendations (including examples) of the Defense Science Board Task Force MPF(F) kicked of a January 2004 Proceedings issue full of ideas (subscription required, or order the mag for additional offline content). Following the Turkey problem in OIF, the Sea Base concept had fully arrived, and it was time to explore "Joint" Sea Basing the implementation.

But sticker shock had forced the foot to the breaks. The US was now fighting two wars, the cost of both was distracting, and the momentum of the idea had been stalled by political reality. Between January 2004 and August 2005 there were a number of changes to the concept. Globalsecurity's development history of the MPF(F) says it all:

In the FY-05 budget process, appropriators significantly cut the MPF(F) program. The proposed FY-06 budget the Navy submitted to the Office of the Secretary of Defense in August 2004 delayed construction of the lead MPF(F) vessel from FY-07 to FY-09, leaving only four such vessels in the long-term budget.

In May 2005 Secretary of the Navy Gordon England made a decision on the MPF(F) squadron configuration, of 14 ships. The squadron design, as well as the number of squadrons (anywhere up to three), was undetermined as of late 2005.

The FY 2005 budget provided for ships in the National Defense Sealift Fund (NDSF). The NDSF budget includes funding for the development of mission variants for the FY 2007 MPF(Future) and the FY 2009 MPF(Aviation). Budget also includes MPF(F) C2 variant lead hull contruction costs incrementally funded beginning FY 2007. Follow-on hulls (qty 2) remain funded under NDSF BLI 011000.

Acceleration of the lead MPF(F) from Fiscal Year 2008 to Fiscal Year 2007 in the Fiscal Year 2005 budget reflects an emphasis on Seabasing capabilities. The Fiscal Years 2005-2009 plan procures three MPF (F) ships and advanced construction for an MPF(F) Aviation variant.

By early 2005 the two major US shipbuilders - General Dynamics (GD) and Northrop Grumman - proposed alternatives to options to the MPF(F). Rather than a new, single MPF-F ship, both shipbuilders proposed spreading the task among several vessels. This would take ships being built today at a known cost, rather than design new ones like the MPF-F at an unknown price. Using existing design and shipbuilding infrastructure could reduce the cost of the projects.

Thus, the MPF(F) was reduced from a 3 squadron replacement for existing MPF squadrons to a single MPF(F) squadron replacement for a single MPF squadron, plus an entire MEB on L-class ships. However, the requirements had also developed, and the buzzword "Joint" was attached.

Seabasing is the rapid deployment, assembly, command, projection, reconstitution, and re-employment of joint combat power from the sea, while providing continuous support, sustainment, and force protection to select expeditionary joint forces without reliance on land bases within the JOA. These capabilities expand operational maneuver options, and facilitate assured access and entry from the sea.

Seabasing Joint Integrating Concept (JIC), 2005

In the Seabasing JIC, the Joint Chiefs defined the capabilities of the MPF(F).

  1. At-sea arrival and assembly of units
  2. Direct support of the assault echelon of the Amphibious Task Force
  3. Long-term, sea-based sustainment of the landing force
  4. At-sea reconstitution and redeployment of the force

“Seabasing is what we saw - or what I describe as the city at sea - that we literally built in Indonesia to help those countries [after the 2004Tsunami]. There is no other institution in the world that could have done that. Seabasing is what we did for Katrina, seabasing was the hundreds of ships off the Turkish coast and all the around the northern Arabian Gulf prior to the commencement OEF.”

Adm Mike Mullen, CNO, 2005

It would appear everyone has weighed in, whether it is the Defense Sience Board, the Congressional Research Service (CRS), the Congressional Budget Office (CBO), the Government Accountability Office (GAO), the Center for Strategic and Budgetary Studies (CSBA), RAND, I already mentioned Proceedings (not since 2005 though, but Bob Timberg assured me articles are coming), and even the US Army.

The consensus: Sea Basing is not Joint. It isn't the forcible entry option recommended by the Defense Science Board, it isn't a replacement for existing forcible entry capabilities found in the amphibious fleet, and it doesn't even support the full ACE of the MEB. Under the current plan, the US Navy would have to donate at least 1 CVN to support the rest of the ACE in the MPF(F). In other words, use commercial ships for amphibious assault, convert amphibious ships into commercial ships to support some of the ACE, and take Navy aviation off CVNs to support the ACE CAS. How does this help enhance USMC capability from the sea?

“Today’s amphibious operations focus on assaults over the shore and into seaports, to establish footholds ashore permitting the build-up of sufficient combat power to conduct operations against inland objectives.”

In contrast, “operations from a future sea base focus on direct assault of inland objectives (with no operational pause) followed by moves to capture seaports or safe shore lodgments for heavier follow-on forces.”

As a result, the Task Force “…concentrates on the ship-to-objective maneuver role of the seabase, since it is the most transformational application. However, the seabase will support other concepts of operations, including amphibious, over-the-horizon assaults.”

Defense Science Task Force on Sea Basing, pp. 14-18

The GAO cost estimates (FY07) for the 3 logistical classes in the current MPF(F) squadron:

  • Large Medium-Speed Roll-on/Roll-off Ship (LMSR T-AKR) - 902 million
  • Mobile Landing Platform (MLP) - 784 million
  • Advanced Auxiliary Dry Cargo Ship (T-AKE) - 384 million

3 of each would be around 6.3 billion total. The cost would be further reduced if Marine births were not necessary on the MLP as currently planned. These 9 ships represent a truly innovative approach to maritime positioning, selective offloading, and sea based logistics. In my opinion the combinations of these three ships is the innovation and the success story of the MPF(F) concept as currently proposed. Why not build this capability, and take some time to research the assault element of Sea Basing more thoroughly before making a major investment?

According to the JIC, the major assumptions driving the Sea Base concept included reduced access from allies for FOBs and that anti-access environments will exist in the future. If that is true, then how does one go from less cooperative neighbors in more difficult access siutations to reducing overall forcible entry capability in terms of numbers of ships and troops. How does point A imply point B in that scenario?

Why would you then reduce the defensive capability for the largest, most vulnerable assets with men and equipment, and run with an industry driven assault concept that doesn't even meet the requirements of a full MEB without adding 2 existing MPF ships, 3 of the largest amphibious assault ships in the fleet, and borrowing CVN space to house Marine Aviation? If the densely packed existing MPF can operate from the new logistical design contained in the 9 new logistical ships, then why not accept the proposed Sea Based logistical capability and continue to research ways for future amphibious capabilities without reducing current amphibious capabilities?

“Planning for the sea base is still in its infancy. Coordination across the Services is just beginning, with discussions between the Navy, the Army, and the Marine Corps, and in response to the Office of the Secretary of Defense (OSD) initiatives. As a consequence, the details have yet to emerge, especially with respect to joint operations and with respect to the availability and needed development of technology to perform the tasks that are envisioned for the sea base.”

Committee on Sea Basing, Naval Studies BoardNational Research Council of the National Academy of ScienceSea Basing: Ensuring Joint Access From the Sea, 2005

The plan as it exists today is not Joint, not even close. A common set of goals and requirements for Sea Basing does not exist in the agencies. There is no ship that addresses the capability to build a runway for the Air Force, nor is there a logistics model to support more than 2 brigades enough supply from the sea. What is the point of calling it Joint if it completely ignores the other services? This Sea Base idea is more in tune with the Coast Guard than it is with the Army or Air Force.

What is the rush to deploy the currently proposed MPF(F)? The GAO report asks an important question that still doesn't have an answer, who is responsible for the Sea Base design? Given recent Navy experience of shipbuilding projects with seemingly no oversight and management, no single person responsible, is running with an industry driven Sea Base really a smart way to go forward?

If the language stays in the current Senate Defense bill, the Navy will have to submit a report by November 2007 on the 10th LPD-17. While the LPD-17 has its fair share of problems, at least it doesn't appear that forcible entry operations are one of those problems. Why not continuing a build of 3 additional LPD-17s while keeping the 2 LHA(R)s and 1 LHD out of the Sea Base? At least that keeps twelve 3-ship ESGs with the forcible entry MEB level around 2.5, and greatly enhances capability when joined with the 9 new logistics ships. Keep the 2 old MPF ships intended for the Sea Base and the Navy still retains 3 prepositioned MEBs, one of which is enhanced.

Why not explore other options, like taking Marine Aviation back to sea in the form of the LPH? It worked the last time the US deployed a large mobile Sea Base in WWII, we called them escort carriers, but hey, same concept. What is wrong with a cheap platform designed for either 10 JSFs or 12 MV-22s, plus a few helicopters? Wouldn't need more than 20k tons for that, if that much, and could be built to commercial standards to save cost since the LHAs and LHDs are for amphibious assaults. Those LPHs would make excellent independent Aviation Sea Bases that could conduct any number of missions, from anti-piracy to MDA to being able to provide an aviation element for Global Fleet Station support or training.

The Taffy Groups in WWII had 6 CVEs each, today 6 LPHs with 10 JSFs each equals the strike component of the ACE for 2 MEBs. What about Army aviation platforms? Last time the US Navy deployed a Sea Base (not including Ocean 6) it was to support Army aviation, not Marines. The LPHs could join with LCS and become a larger, integrated Sea Based SOCOM solution. They already operate off MSC ships, so the commercial standard shouldn't raise any flags.

Either way, that is a more joint concept than what is currently proposed. It shouldn't be hard for the Navy to sell the 9 logistics ships already planned to Congress even without the full Sea Base concept. With all this political talk of impending Climate Change that is going to bring on natural disasters, name a single program better suited to address any unseen developments as a result of Climate Change than 9 MSC ships designed for selective offload for an incredible amount of supplies to virtually any location in the world. A $6.3 billion dollar investment on Joint Sea Based logistics makes a lot more sense than a $12+ billion program that fundamentally changes the capabilities empowering the USMC operating from the sea.

The logistics plan of the Sea Base is truly innovative, and scales to demand for virtually any scenario where an offshore logistical sea base would be needed. The Assault aspect of the current Sea Base design falls well short of innovative. It doesn't address joint deployment or joint assault, it doesn't address joint forcible entry, and to achieve its zenith in capability, it requires enormous sacrifices of resources that would be required in that situation for something else, meaning the highest achievement potential of 2 MEBs in 1 10 hour period of darkness is questionable at best because the other assets (like a spare CVNs) required to achieve that assault may not be available to support it.

Special thanks to Robert Works slides for some of the quotes.

Friday, July 13, 2024

Strategic Frigates and Strategic Corporals

"Strategic Frigates and Strategic Corporals" is the new buzz phrase for the US Navy for "Mission-tailored, distributed forces" expected to be included in the soon to be released new Naval Maritime Strategy. Reading the news of the day, I got the impression the USS Doyle (FFG 39) is playing the role of the Strategic Frigate by this new definition today as it prepares the way for the USS Fort McHenry (LSD 43) upcoming Global Fleet Station deployment.

The buzz phrase will be used as a description to the approach the Navy will take to "foster cooperative relationships; maintain order; provide new approaches for deterrence, escalation and the de-escalation of conflict; and provide homeland defense" according to an article last month in InsideDefense.

The article goes on to describe some of the aspects of the upcoming new Naval Maritime Strategy:

The briefing lists two maritime objectives, the first of which is conducting a full range of operations to prevent and deter conflict. This includes fostering trust and confidence in the global system through new maritime relationships; easing sources of instability, countering extremist ideology, preventing or containing conflict and deterring aggression; and ensuring that key regions, lines of communication and the maritime commons remain accessible for free and open use. The second objective is countering aggression when necessary.

The briefing also lists six maritime strategic imperatives -- the ways to meet the goals. The imperatives are promoting cooperative relationships with other countries, preventing and mitigating disruptions to the world order by providing security, deterring and containing regional conflict, deterring war between major powers, winning U.S. wars and defending the homeland. Together, these form a systematic approach to the escalation and de-escalation of conflict, the briefing says.

I'm going to reserve final judgment for the real thing. I really just wanted to post the link to give people a heads up, and post the one statement in the article that encouraged me the most.

Mullen told the audience he now views 313 ships as the minimum size for the fleet. The Navy may need even more ships, he said in a departure from previous statements.

Gee, ya think? Looks like the 313-ship plan is dead.

Sunday, July 8, 2024

Will Earmarks Push Change in the Naval Shipbuilding Culture?

Earmarks are often characterized as a means for a public official to circumvent the public finance system to provide funding for a specific expenditure usually associated in some way in US politics with the geographic location specific to the constituency of the politician proposing the earmark. An earmark almost always carries a negative connotation to it, because in general it is considered an exploits taxpayer money in a way that assigns specific purpose to money that would otherwise be allocated through the general fund. The negative implication behind those utilizing earmarks is that it provides an avenue for corruption or kickbacks by the receiver of the business receiving a contract through earmarks, and in fact it happens quite often.

Duncan Hunter, R-Calif., appears hell bent on using earmarks to push his theories on the Navy, and the Navy appears hell bent on resisting. For one, the theories Duncan Hunter is pushing do not fit nicely into the Navies current plan, and second the specific items being pushed are not necessarily on the priority radar as far as the Navy is concerned. Both projects, however, are interesting in that they are definitely transformational by the Navy's own definition, more so even than many of the Navy's own projects, and both of them would very much effect the current 313-ship plan that appears dead on arrival anyway.

The first project is the Sea Fighter (FSF 1), which through earmarks Duncan Hunter wants to be commissioned into the US Navy, and utilized in a way the Navy really doesn't want to use it... namely as a patrol vessel. There are obviously problems here, for one the LCS is both gas and diesel ship, has limited range, and doesn't have any weapons or a hanger. While it is an interesting ship to experiment with, which is what the Navy is currently using it for, it really isn't designed to be a front line vessel, at least from the Navy's point of view.

Personally, I haven't seen much that has sold me on the idea of deploying the ship, however I am open to new ideas because the current ideas appear flawed. For one, the Sea Fighter (FSF 1) could be doing some good today beside the HSV Swift in the Global Fleet Station. While Duncan Hunters idea is to replace the HSV Swift with the Sea Fighter (FSF 1), and idea I don't really like much, I think it would do very well to augment it, and within the framework of the current Global Fleet Station to South America the Sea Fighter (FSF 1) could be doing some good establishing some presence and intelligence gathering in the drug trade.

One of the things that has been bothering me about the current Global Fleet Station deployment is that it would appear it has too much of a tactical focus, with a real lack of strategic knowledge accumulation going on in a specific focus area. The HSV Swift arrives, trains local law enforcement based on their individual request, and then leaves. In Belize the Swift departed in time for the USNS Comfort (T-AH 20) to take over. In a way, if these two pieces were considered part of the same mission (which I am willing to do) this is a really smart approach. In the Dominican Republic, the HSV Swift arrived, delivered a few small boats, and trains the Dominican Navy in anti-narcotics work. When the Swift leaves, the USCG will remain as a static partner, again how it should work.

However, for say the Dominican Republic for example, there is no strategy for handling incoming and outgoing maritime traffic from points across the Caribbean Sea, something that needs to be established. There are no vessels fast enough to move around in the blue waters to track the cross Caribbean sea movements of illegal trade trafficker's. That role requires a considerable amount of time, persistence, and reach with platforms like UAVs. In that role, Sea Fighter would appear well fitted.

After all, isn't that what the LCS is for?

Or is the Sea Fighter too big for the job? If so, why not send in the M80 Stiletto? It too could fit well into the Global Fleet Station concept. It is true it would need a mothership, but had someone been thinking about it, the USS Pearl Harbor currently completing the UNITAS exercises in the region has a well deck able to house the M80. Why the USS Pearl Harbor and its force wasn't integrated into the Global Fleet Station concept to begin with is already an issue, but more with the limited scope the first Global Fleet Station had than with that specific deployment. Apparently the M80 is in the same boat (no pun intended) as the Sea Fighter (FSF 1), it is novel, but nobody really wants it right now because it doesn't fit into the plan.

Personally, I think what the Sea Fighter (FSF 1) and the M80 Stiletto represent is the SOCOM element of Sea Basing under the Seapower 21 concept, but Seapower 21 appears on the way out and Sea Basing specifically has taken a new form altogether different than the Defense Science Boards original purpose.

Personally, while I am not a big fan of pork, earmarks is about all that is out there right now for Congress to force changes upon the Navy in its direction. While I have never cared much for Duncan Hunter one way or the other, in this case, I'll be cheering him on to force the Sea Fighter (FSF 1) on the Navy, because the reality is, cheering for Duncan Hunter in this case is cheering for the little guy shipbuilder, the same shipbuilding the Navy has basically given the finger to in favor of the same big industry bunch that could use a healthy dose of competition to wake them up and get their shit together.

Sunday, June 17, 2024

Senate Bill Slams the Navy and LCS


When I read a NavyTimes article earlier this week titled "Admiral confident of LCS despite setbacks" I thought maybe the Senate was going to fully fund the LCS project for FY08. The House has already passed its bill, and it reduced the presidents request for the LCS from $910.5 million to $710.5 million, which is below the presidents request enough that it became very unlikely the Navy was going to build anywhere near the 3 ships they were hoping this year.

The Senate, not to be outdone by the House, has taken the entire matter a step further. The emphasis in bold is mine.

Littoral Combat Ship

The budget request included $910.5 million in Shipbuilding and Conversion, Navy (SCN, line 15) for the construction of three Littoral Combat Ships (LCS). The Navy intends this to be a relatively smaller, more affordable vessel that carries modular payloads. The Navy concept is that, on one day, an LCS might be configured to operate as an anti-submarine vessel. However, as a mission needs to change, it could rapidly change the whole mission payload, within a day or so, and operate in an anti-surface warfare or mine warfare mode.

Each of the two prime contractor teams had contracts to build two ships. The prime contractors have teamed with smaller shipyards in both cases in order to keep LCS costs lower than would be possible in one of the major yards that normally build Navy ships.

The first ship (LCS-1) was scheduled to deliver in late 2006. The Navy is now estimating that the first ship will deliver sometime in the middle of 2008. The LCS-1 contractor team had barely started on their second ship (LCS-3) when the program ran into major cost problems earlier this year. The Navy then issued a stop work order on LCS-3 in order to reduce expenditures and limit further cost exposure on the program while it separately re-evaluated program cost estimates.

The Navy entered into negotiations with the LCS-1 team to sign up to a fixed price contract on the two ships or face outright cancellation on the second ship. These negotiations occurred during this past spring. When the stop work order was nearly ready to expire, the Navy announced that it and the LCS-1 contractor team were unable to reach an agreement and that the Navy was terminating the contract for LCS-3 for the convenience of the Government. It is too early to precisely estimate the termination costs, but the Navy has reported that significant funds for LCS-3 are on hold pending completion of the termination negotiations.

The second contractor team has a contract to build two LCS vessels of another design (LCS-2 and LCS-4). The Navy awarded this contract later, so LCS-2 is roughly 1 year behind the LCS-1. Unfortunately, it appears that this team is experiencing similar cost problems. The Navy has not issued the same ultimatum to this contractor team, but has claimed that the Navy will do so if the cost of LCS-2 continues to grow toward the Navy's estimate. Meanwhile, the Navy is proceeding with the start of construction on LCS-4, although it is not clear that the root causes for early cost growth on LCS-2 have been addressed.

The committee is disappointed that the cost of the lead ship has more than doubled and the delivery schedule has slipped several times.

The committee commends the Secretary of the Navy for exercising oversight and for trying to bring cost and schedule discipline to this troubled program. The committee is also interested in supporting the Secretary's efforts to improve the Navy's acquisition process. Reviewing this LCS situation will undoubtedly result in a new set of `lessons learned' that the acquisition community will dutifully try to implement. However, the committee has previously expressed concerns about the LCS concept and the LCS acquisition strategy. The LCS situation may be more a case of `lessons lost.' Long ago, we knew that we should not rush to sign a construction contract before we have solidified requirements. We also knew that the contractors will respond to incentives, and that if the incentives are focused on maintaining schedules and not on controlling cost, cost growth on a cost-plus contract should surprise no one. After the fact, everyone appears ready to agree that the original ship construction schedule for the lead ship was overly aggressive.

The Navy has said that the capability that this vessel will bring to the fleet is of the utmost urgency for responding to asymmetric threats. The committee believes that if the Navy really believed that the threat were that urgent, it might have taken more near-term steps to address it. For example, the Navy might not have cancelled the remote minehunting system (RMS) capability on a number of the DDG-51 class destroyers, ships that will be available to the combatant commanders much sooner than LCS. The Navy might also have taken this modular capability slated for the LCS and packaged those modules to deploy sooner on ships of opportunity. Rather, the Navy is waiting on a shipbuilding program to deliver that capability (in a useful quantity) at some future date.

The Navy now proposes to use the funds requested in fiscal year 2008 to award contracts for two LCS vessels, rather than the three originally envisioned. Given the uncertainty about what is happening with the earlier ships in the program and uncertainties about the options for an acquisition strategy that will remain available to the Navy next year, the Navy does not intend to award these two contracts until late in fiscal year 2008.

The Senate Bill text is as follows:

  1. a high degree of cost uncertainty will continue to overshadow the LCS program until the two lead ships execute test and trials, starting late in 2007.
  2. the Navy's current estimate is that the approximately $1.6 billion appropriated for the first six ships will be required to complete the three ships currently under contract, with significant additional funding being held for termination of a fourth ship.
  3. if the Navy's estimates are correct, or low, then the Navy will be engaging in fixed price negotiations with the second prime contractor for LCS-2 and LCS-4 late in 2007, with the distinct possibility that LCS-4 would be terminated.
  4. if the Navy's estimates are high, then sufficient funding from within previous appropriations should be available for a newly procured LCS.
  5. the Navy has yet to formulate its acquisition strategy for the LCS program, however, the challenges inherent to fair competition between two dissimilar ship designs have become significantly more complex in light of the recent termination of LCS-3 (or potential termination of LCS-4).
  6. the Navy has announced a delay for conducting a program downselect decision until 2010, at which time it also plans to revise the LCS combat system, which raises concerns regarding the infrastructure and life cycle support costs for the three or four ships of the LCS variant not selected for `full rate production.'
  7. program delays have pushed the next notional contract award until late in fiscal year 2008.
  8. termination negotiations for LCS-3 will likely be proceeding at the same time the prime contractor is being solicited for a proposal to build another LCS ship, in which case the material procured for LCS-3 would likely revert back to the contractor for this new procurement. The net effect is that the current LCS-3 obligations that are fenced for termination costs would sufficiently cover the contractor's fiscal year 2008 obligations for a newly procured LCS.

The committee recommends $480.0 million for LCS in fiscal year 2008, a decrease of $430.5 million. We cannot relive the early days of the LCS program and remember `lessons learned,' but we have the opportunity to take positive steps now to right the program. Before awarding contracts for additional ships in the LCS program, we need to maintain focus on delivering the most capability possible for the $1.6 billion invested thus far for six ships. This would require that we impose accountability for the quality of program estimates; halt further changes to program requirements; and ensure that the contracts provide effective incentives for cost performance.

The Secretary of the Navy has advised the committee that the Navy's estimates appear to be quite conservative based on contractor performance over the past quarter, as measured against recently revised baselines. Although further risk is acknowledged, the Navy has expressed confidence that the program will be able to improve on the Navy's worst case estimates and avoid further termination action. If the Navy and industry are successful in managing costs going forward, this should allow four ships to be delivered within previously appropriated funds.

The committee notes that the LCS-1 contractor was awarded a lead ship contract that targeted a significantly lower price and a significantly more aggressive schedule for starting construction. The risks inherent in this aggressive schedule were exacerbated by changes to Navy requirements. These factors may have contributed to the decision to terminate LCS-3--an outcome referred to as `winner-loses.' The resultant imbalance between the two competing shipbuilders jeopardizes the Navy's ultimate goal for a competitive downselect in 2010, followed by full and open competition for the winning LCS variant.

Therefore, the committee directs that funds authorized for a fiscal year 2008 LCS ship may only be used when combined with LCS SCN funds appropriated in prior years, to solicit, on a competitive basis, bids for two fixed price LCS ship construction contracts, one for each of the two competing LCS variants. The Secretary of the Navy may waive this requirement only if: he determines that there is only one acceptable LCS variant, based on completion of acceptance trials on the two LCS variants; and he notifies the congressional defense committees 30 days before releasing a solicitation based on that waiver determination.

The committee believes that the history of the LCS acquisition strategy has been one of documenting decisions, rather than guiding and informing decisions. Therefore, the Secretary of Defense is directed to submit a report on the approved acquisition strategy for the LCS program at least 90 days prior to issuing any solicitation or requests for proposal, but no later than December 1, 2008.

The Senate goes on to address the Mission Modules:

LCS modules

The budget request included $80.3 million for assembling and outfitting Littoral Combat Ships (LCS) mission modules. The Navy intends the LCS to be a relatively smaller vessel that carries modular payloads. The Navy concept is that, using these mission modules, an LCS might be configured to operate as an anti-submarine vessel on one day. On the next day, the Navy might change the whole mission payload and operate the LCS in an anti-surface warfare mode.

As described elsewhere in this report, the LCS program has run into serious problems. The committee sees no particular reason to acquire mission modules at the pace planned by the Navy, since there have been significant delays in the ship program. The committee recommends a decrease of $65.0 million for LCS modules.


For background on LCS problems, you can check this out for the Navy statements after the stop order on LCS 3, and here for the Industry statements for the cost problems of LCS 3. Both statements hit home on several points, from the problem obtaining HSLA-80 steel (a topic for another time, but an important topic nonetheless), but more importantly it highlights the LCS priority of the Future Years Defense Plan (FYDP) (FY2008-FY2013). Specifically:

32 LCS hills
16 SUW modules
11 MIW modules
6 ASW modules

In other words, small boat warfare is the focus of the LCS program. The ASW module purchase for the first 32 LCS ships is only 6 modules, less than 20% of the total number of modules purchased. Next time someone says the Littoral Combat Ships is about ASW, tell them that according to the numbers, the Navy respectfully disagrees.

Its ok though, thanks to earmarks, Duncan Hunter wants the Navy to operate a Littoral Combat Ship, specifically Sea Fighter (FSF 1) that the Navy wants nothing to do with. Maybe the Senate version will push it through, and the Navy will end up with 4 LCS hulls after all. I'm not a fan of earmarks, but at the end of the day Sea Fighter (FSF 1) can do more to fight small boats today than the LCS will be able to anytime soon.

The House Bill and Senate Bill still have to be worked out in committee, but no matter what it would not appear the LCS is going to survive FY08 without a bloody nose, or if some of that Senate language makes the bill, a swift kick in the nuts.

Finally, the 313-ship Fleet is dead on arrival. The Navy needs a new plan, so far they have lost 1 LCS in FY 06, 2 LCS in FY07, and at least 2 so far in FY08, and the only gain to offset this is the Sea Fighter (FSF 1) which the Navy doesn't want. Hopefully the next 12 months produces results, because according to the 313-ship plan, next year the Navy buys 12 ships, 6 of which are supposed to be Littoral Combat Ships.

In other words, it not only can get worse for the Navy, things most likely will.

Thursday, June 14, 2024

The 313-Ship Plan: Iceberg Ahead!

Back in 2003, Congress became frustrated as the Navy constantly changed the rational behind the Navy's fleet operational requirements. At the time, inflation in shipbuilding was becoming a noticeable problem to Congress, so they instructed the Secretary of Defense to submit two "Naval Fleet Platform Architectural Studies" by January 2005.

The Law directed that one of the studies be conducted by the Office of Force Transformation (OFT), Office of the Secretary Of Defense (OSD), and the other by an independent Federally Funded Research and Development Center (FFRDC), which was conducted by the Center for Naval Analysis (CNA).

At the time, Robert (Bob) Work of the independent Center for Strategic and Budgetary Studies (CSBA) also conducted his own study. The CNA study has never been released publicly (that I know of), but the OFT report and CSBA report are available online. In April, Ronald O’Rourke of the Congressional Research Office released a final summery that compares all 3 reports.

Personally, I find both the OFT report and the CSBA reports a good read, well worth the time for those looking to understand 'some' of the alternatives to the current USN 313-Ship plan. I will warn traditionalists though, the OFT report is an exercise in theory based on some of the Cebrowski models of the late 90s.

With these reports in hand, and the Defense Science Board's recent report on Sea Basing, Congress should have been ready to take on the Navy when the 313-ship plan was produced. The Bush Administration had spent 5 years producing a shipbuilding plan that indicated what ships would be built the following year, only to change the plan again the next year. FY07 was supposed to be the first year this pattern didn't happen, until Congress decided this year to cancel the 2 FY07 LCS ships and fold that money into the first 3 LCS for cost reasons. That makes the upcoming FY08 budget the first year this may happen, but again because of LCS costs, that may not happen. This volatility in shipbuilding is compounding the inflation problems, and that lack of consistent planning and proper budgeting ships from the Navy leaves many with no confidence for the future for good reason.

The Congressional Budget Office (report), as well as other independent researchers like Eric J Labs, have drawn several conclusions from the 313-ship fleet. Bottom line, itis not affordable.



Assuming no inflation:

The Navy expects Sea Basing to cost $14.5 Billion for a single MPF(F) squadron. The Navy expects the LCS to cost around $18 Billion for 54 LCS and 108 modules. The costs of both have already risen considerably. The Navy expects the DD(X) to cost $20 billion for 7 ships. That is $52.5 billion.

The CBO estimates for all 3 programs are considerably higher, and if you add up their estimates the number is closer to $70 billion. The cancellation of LCS-3 in the first full fiscal year of the 313-Ship plan is an early sign of big problems ahead. While we can't call it the 312-Ship plan until after the FY08 defense budget is finalized, hopefully Congress is paying attention.

We'll see, rumors of more submarines and a 10th LPD means Democrats may be doing their own thing with the Navy, but it is still too early to tell. With Democrats and defense issues, the reason they have earned their reputation for being weak is because on National Security issues, they are too obviously trying to please their base for political points as opposed to publicly addressing a national security issue with wisdom. That type of governance doesn't inspire professionals.

iceberg, dead ahead.